Drywall Repair Kent logo
Square drywall patch with fresh joint compound on a living room wall, a taping knife and mud pan beside it and a drop cloth on the floor

Free drywall referral line for Kent, WA

Drywall Finishing and Mudding in Kent, WA

  • Typical cost: HomeGuide puts hung-and-finished drywall at $1.50 to $3.50 per square foot and finishing a 12x12 room at $580 to $1,800; the finish level decides where you land.
  • Time on the job: 2 to 3 days after the board is hung, since compound needs at least 12 hours between coats and most jobs take 2 to 3 coats plus sanding.
  • Finish levels: the Gypsum Association's GA-214 runs from Level 0 (no tape) to Level 5 (a skim coat over the whole surface).
  • Fast-setting compound: USG's Easy Sand line sets in 10 to 14 minutes at the quick end and 170 to 270 minutes at the slow end.

Drywall Repair Kent sends your request on to one independent finisher near Kent, for board that's hung but not taped, or the new wall that has to blend into an old room. Say how many sheets or square feet are up, what paint is planned and when the room needs to be ready.

Finishing Jobs, From Hung Board to Paint-Ready

Finishing is everything that happens after the board is screwed up: tape, coats of compound, sanding and a primer. These are the finishing jobs people ask about most.

Newly hung drywall in a bonus room with the first coat over taped seams

Finishing Board Someone Else Hung

Owners who hang their own board, or remodelers who hang and then bring in a finisher, need tape and coats only. USG's method for its joint compound is a fixed sequence:

  • Embed the tape in compound and let it dry
  • Second coat, feathered about 2 inches beyond the first, then let it dry and sand
  • Third coat, feathered another 2 inches beyond the second
  • At least three coats over fasteners, corner bead and inside corners

HomeGuide prices taping and mudding a standard 12x12 bedroom at $180 to $580. If the hang has wide gaps or screws that broke the paper, mention it in the request.

Tying New Seams Into an Existing Room

A new wall, a closed-in doorway or a cut-in window opening leaves new board butting against painted, finished board. The new joints have to be feathered onto the old surface so the step between them doesn't show, coat by coat as in USG's sequence above. Ask for the new section to be finished to the same level as the room it joins. For what new walls need from the city, see Kent permits for new drywall.

Outside Corners, Arches and Trim-Off Details

Corners and edges get more coats than flat seams; the GA-214 list below gives the count at each level. For curved work, see drywall arches and niches.

Fast-Setting Compound for Tight Schedules

Setting-type compound comes as a powder you mix with water, and the number on the bag is its working time. USG's Easy Sand range:

  • Easy Sand 5: 5 minutes to work, sets in 10 to 14
  • Easy Sand 20: sets in 25 to 35 minutes
  • Easy Sand 45: sets in 50 to 65 minutes
  • Easy Sand 90: sets in 95 to 120 minutes
  • Easy Sand 210: sets in 170 to 270 minutes

USG adds that adding water won't slow the set, that temperature and humidity shift it, and that setting compound shouldn't go over damp surfaces or be used for thin skim coats.

Smooth primed living room wall ready for dark paint, roller tray on a drop cloth

Choosing the Finish Level Room by Room

GA-214 is the Gypsum Association's standard for finish levels, and naming the level in the quote is the clearest way to know what you're paying for. Its table, with the extra coats each level adds after the tape coat:

  • Level 0: no taping or finishing; for temporary work or where the final finish hasn't been decided
  • Level 1: tape set in compound only; attics, above ceilings and other concealed spaces
  • Level 2: tape wiped with a thin coat, one coat over fasteners and accessories; under tile, and in garages or storage where looks don't matter
  • Level 3: one more coat on flat joints, two on fasteners and accessories; under medium or heavy texture, not for smooth walls
  • Level 4: two more coats on flat joints, three on fasteners and accessories; smooth walls with flat paint, light texture or wallcovering
  • Level 5: Level 4 plus a thin skim coat over the entire surface; glossy or dark paint and critical lighting, and the best at keeping joints and screws from showing through

A garage at Level 2 and a living room at Level 4 or 5 in the same house fits GA-214's guidance. For the rated garage walls themselves, see garage firewall drywall.

Basement walls with taped and mudded drywall seams, a pole sander, a compound bucket and a work light

Why Kent homeowners, landlords and businesses call Drywall Repair Kent

  • Your request goes to one independent local drywall contractor, not a bidding list
  • The referral is free, and booking is up to you
  • Ask for the finish level, texture and paint as separate lines
  • Check L&I registration and bond before work starts
  • Keep the deposit small and pay as the coats are finished

Get a free drywall repair estimate

Free for homeowners, landlords and businesses. One local contractor contacts you.

Cost by Finish Level, Coats and Drying Time

HomeGuide prices each level per square foot, hung and finished:

  • Level 0

    $0.85 to $1.90
  • Level 1

    $1.15 to $2.15
  • Level 2

    $1.30 to $2.60
  • Level 3

    $1.50 to $2.75
  • Level 4

    $1.70 to $3.20
  • Level 5

    $1.75 to $3.50

Taping and mudding alone runs $0.35 to $1.10 per square foot. By room, HomeGuide's finishing totals are $300 to $1,000 for a 5x8 bathroom, $850 to $3,100 for a 16x20 living room and $1,500 to $7,000 for a 1,000-square-foot basement. They're national figures; the price for your rooms is the one a contractor writes after measuring them.

Drying time is where schedules slip. USG's own instructions say only "let dry" between coats and give no hours. HomeGuide's working figure is at least 12 hours between coats of premixed compound, which is why HomeGuide gives 2 to 3 days to finish after hanging.

Frequently asked questions

The plan says Level 4 for our family room, but we want a deep navy accent wall. Is Level 4 enough?

Probably not for that wall. GA-214 says non-flat or dark, deep-tone paints aren't recommended over Level 4 and points to Level 5, which adds a thin skim coat over the entire surface. HomeGuide prices Level 5 at $1.75 to $3.50 per square foot against $1.70 to $3.20 for Level 4, a small gap for a single wall.

Our new garage room has no heat yet and it's November. Can the taping go ahead?

Only once the space can be kept warm. USG's finishing instructions call for the building to be held at 55°F or more, with ventilation, while compound is applied and dries. Its setting-type compound sheet sets a 45°F minimum for surface, water, mix and air in cold weather until the joints are completely dry.

Is the fast-setting powder as good as premixed mud, or is it a shortcut?

It does a different job. The National Park Service notes that quick-setting compound hardens by chemical reaction rather than by drying, and shrinks less than all-purpose mud. USG still says not to use setting compound for thin skim coats, so it isn't the material for a Level 5 surface coat.

Ready to get started in Kent?

Tell us about the job and a local drywall repair contractor will get back to you with a free estimate.

Get a free drywall repair estimate

Free for homeowners, landlords and businesses. One local contractor contacts you.